![Loading Events](https://www.uppersaucon.org/wp-content/plugins/the-events-calendar/src/resources/images/tribe-loading.gif)
- This event has passed.
PARK CLOSURE: FERTILIZATION (1 day only)
June 28, 2016 - June 29, 2016
early summer liquid fertilizer with broadleaf weed control (Triplet – spot treatment where necessary).
grub and surface insect control (imadacloripid and bifenthrin)